Can waves come back to Long Beach? 6 alternatives have been announced (2 breakwater alternatives!)
Mayor Garcia announced on September 24, 2018, that the 6 draft alternatives will be included in the formal Integrated Feasibility Report (IFR) for the East San Pedro Bay Ecosystem Restoration Study. 2 of 6 alternatives are breakwater alternatives (see draft alternatives brief) City of Long Beach and Army Corps of Engineers are hosting a community … Continue reading Can waves come back to Long Beach? 6 alternatives have been announced (2 breakwater alternatives!)
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed